上海威理泵业有限公司隔膜泵及零部件 · 中国上海willeepump@gmail.com
WILLEEPUMP TECHNOLOGY

WILDEN 隔膜更换:确认完整组件

订购前,根据泵型号、零件号、行程设计及背膜确认 WILDEN 隔膜。

WILDEN 02-1010-55

Start with the installed pump

一个WILDEN隔膜订单需要的不仅仅是口径和PTFE字样。 记录完整的标牌型号、隔膜零件编号和相关的爆破图参考。 设备安全隔离和清洁后,拍摄标牌和拆除部件的两侧。

This guide addresses replacement identification. For a broader comparison of material families, read our PTFE, EPDM and TPE diaphragm guide.

Separate material, design and supply scope

支票 What to record 为什么这很重要
材质 Wetted-face material and any separate backing 材料标签并不标识完整的装配体。
设计 Reduced-stroke, full-stroke or integral-piston construction, as documented 不同的设计可能需要不同的相关组件。
供应范围 Individual diaphragm, backing component or complete wet kit The quoted line must cover the components actually required.
Installed configuration Full pump code and manufacturer parts-list revision Nominal size alone cannot establish interchangeability.

Wilden offers rubber, thermoplastic elastomer and PTFE material families. Its PTFE range includes different stroke designs and backing combinations. Use the WILDEN diaphragm brochure to identify the design family, then use the manual for the installed pump to confirm the assembly.

具体的零件编号示例

WILDEN 02-1010-55 is listed as a reduced-stroke PTFE diaphragm for a nominal 1-inch pump. That description identifies a particular component; it does not approve the part for every 1-inch WILDEN pump. Confirm the backing and assembly reference before ordering it.

If several wet-side wear components are required, compare the individual parts list with the WILDEN wet-kit selection guide检查每个包含的项目和数量,而不是假设包裹照片定义其内容。

检查过程以及配合

Prepare the fluid name, concentration, operating and cleaning temperatures, and any abrasive solids information. A mechanically correct replacement still needs a material review for the actual exposure. When the service has changed, make the change explicit in the enquiry rather than repeating the previous order without review.

For a failed diaphragm, retain a cleaned sample and a record of the operating conditions. Our failed-diaphragm evidence guide explains how to organize that record. Installation sequence, tightening values and commissioning checks must come from the manual for the exact configuration.

Send a checkable replacement request

  • 完整的泵模型和标牌照片。
  • 隔膜零件编号、数量和现有支撑的识别。
  • Manual reference and whether the request is for an individual part or a kit.
  • Process fluid, concentration, temperature and required delivery destination.

联系 WILLEE for a configuration and availability check. See also our pump and spare-parts FAQ.

将此内容纳入您的下一次查询

Keep the pump code, diaphragm part number and backing specification together in the purchase record.

联系 WILLEE

请使用说明和规格来确定设备的确切配置。 本文介绍了选择讨论。

让我们来谈谈您的应用

你的过程。
我们下次谈话。

发送 WILLEE 您的流体、运行条件或完整的泵代码。 从您所掌握的信息开始。

讨论您的要求 WhatsApp WILLEE

需要泵或备件?

请将您的型号或零件编号发送给我们,以获取库存情况和报价。

查询表格

打开联系页面 ↗