ARO PD10P-FPS-PTT uses end-flanged ports, while PD10P-YPS-PTT uses center-flanged ports. Compare the full model, drawing and site connections before accepting a replacement.

ARO PD10P-FPS-PTT and PD10P-YPS-PTT differ in fluid-port location: F identifie un arrangement à bride d'extrémité, tandis que Y identifie un arrangement à bride centrale. Un devis qui change de F à Y nécessite donc une révision de l'ajustement de la tuyauterie, même lorsque les codes de matériaux restants correspondent.

What the two model codes tell you

In ARO’s current PX10P model chart, both arrangements use 1-inch ANSI/DIN flanges. For these two codes, the center body, fluid caps and manifolds are polypropylene; the hardware is stainless steel. The PTT suffix identifies polypropylene seats, PTFE balls and PTFE/Santoprene diaphragms. It does not mean every wetted component is PTFE.

These definitions come from the manufacturer’s PX10P operator’s manual, revision AB, dated March 6, 2026, modèle de la page 2. Copier toute révision supplémentaire ou suffixe de spécialité de la plaque signalétique installée. Ne pas le supprimer silencieusement lors de la demande d'un devis.

Comparer le dessin avant d'accepter un substitut

ARO’s PD10P/PE10P sales and engineering sheet, revision H, montre des configurations séparées de brides filetées, de brides d'extrémité et de brides centrales. Sa dimension de dessin A est 407.3 mm pour la version à bride d'extrémité et 361.2 mm pour la version à bride centrale. Il s'agit de références de dessin, pas d'une enveloppe d'installation complète.

Pour un skid existant, utilisez une photo marquée et un croquis coté. Notez les lignes d'axe d'entrée et de sortie par rapport à la surface de montage, la direction d'approche du tuyau et l'espace disponible pour retirer chaque raccordement. Incluez les vannes, les gardes et les chemins de câbles à proximité.

Demandez au fournisseur d’identifier chaque différence proposée sur le devis. « Pompe en polypropylène équivalente 1-inch » est une définition trop large pour être approuvée par rapport à un arrangement de tuyauterie existant. identifying threads and flanges before ordering.

Une liste de contrôle pratique pour les demandes de remplacement de pompe

Send one consistent set of information to each supplier so that prices can be compared on the same basis:

  1. Installed identity: a readable nameplate photo, complete model code, serial number and any recorded modifications.
  2. Required port layout: confirm end or center position and attach photographs showing both inlet and outlet. Mark which pipe connects to each.
  3. Détails de connexion: record the mating flange standard, size, bolt pattern and gasket arrangement. Ask which connection hardware is included in the offer.
  4. Contraintes d ' ajustement: provide mounting-hole spacing, pipe centerlines, available height and width, and maintenance access. Flag any dimension that cannot change.
  5. Process duty: give liquid composition and concentration, operating temperature, viscosity, solids information, required flow and discharge pressure.
  6. Installation conditions: describe suction lift or flooded inlet, inlet pressure, hose lengths and compressed-air supply under load.
  7. Portée commerciale: state quantity, destination and required delivery date. Request a written list of supplied accessories, exclusions, documentation and confirmed lead time.

Keep a short deviation list beside the offers: original requirement, proposed change, evidence supplied and person responsible for acceptance. Leave unresolved items open instead of treating a lower price as acceptance of a different configuration.

Vérifiez le devoir ainsi que l'ajustement physique

The official ARO 1-inch EXP non-metallic product page lists a family maximum flow of 53 US gpm and maximum operating pressure of 120 psi (8.3 bar). Those headline limits do not promise that flow at that pressure in your liquid. The engineering sheet’s curves use water at ambient temperature. Ask for a duty-point review for the actual configuration and operating conditions.

Un suffixe PTT correspondant n'établit pas non plus l'adéquation chimique. Vérifiez tous les composants mouillés, y compris les joints, pour les fluides de processus et de nettoyage. wetted-material compatibility checklist helps organize that enquiry.

Questions fréquemment posées sur les assurances

Peut PD10P-YPS-PTT remplacer PD10P-FPS-PTT directement ?

N’acceptez pas un remplacement avant que le dessin, les raccordements et la disposition du site proposés aient été vérifiés, ainsi que le modèle complet et la fonction.

PTT signifie-t-il une pompe entièrement PTFE ?

No. In these model codes it describes the seats, balls and diaphragm option. The pump body and other components must be checked separately.

Les tuyaux existants peuvent-ils être forcés à s'aligner?

No. ARO’s manual requires supported piping and flexible suction and discharge connections. Have qualified personnel review the installation; isolate and depressurize the equipment before work.

Request a configuration check

Send WILLEE Pump the complete model code and installation details for a replacement-pump enquiry. WILLEE is the supply contact; ARO is the referenced manufacturer. Configuration, compatibility, documentation, price and availability require confirmation for each enquiry.

Retour aux informations

Parlons de votre application.

Envoyez votre fluide, vos conditions de fonctionnement ou votre modèle de pompe existant à WILLEE.

Contactez notre équipe

Besoin d'une pompe ou de pièces de rechange ?

Envoyez-nous votre modèle ou numéro de pièce pour la disponibilité en stock et un devis.

Chargement du formulaire de demande…

Ouvrir la page de contact ↗